APaaS Assure maps every application and its real usage to live NIST NVD and CISA KEV vulnerabilities, holds each to the Cyber Essentials 14-day clock, then packages and deploys the remediation to Intune or Configuration Manager. One platform for the IT teams and service providers keeping UK estates certified.
Water & utilitiesInfrastructure consultancyDefence & aerospaceTransport & railBuilt environment
Most tools tell you what's wrong. This one helps you fix it.
CE+ is a single point in time. Your estate isn't - and over 100 new CVEs are published every day. APaaS Assure closes the loop from exposure to packaged fix, in one console.
Unified estate inventory
Your ITAM, Intune MDM and our lightweight agent in one normalised view. Where ITAM reports "Edge v1", the agent fills in the full build - plus accurate per-application usage, so you can right-size licences and evidence real software savings. No CSV reconciliation, no blind spots.
KEV-aware risk register
CISA KEV + NIST NVD overlaid on your live estate every 4 hours, with an SLA clock mapped to the CE+ 14-day patch window and breach alerts against Annex A.
5Rs rationalisation
Per-app and per-version Retain · Reduce · Replace · Remove · Replatform plans driven by real usage data - on every product in the estate, catalogued or not. Manual override at any level, fully audited.
Automated packaging
Pick an app, and the platform downloads the latest release and wraps it in PSAppDeployToolkit v3 to your client standards - install logic, audit keys, hardening, documentation. The work an outsourced packaging house bills at £5,000 and a fortnight, your team completes in minutes - then deploys straight to Intune or Configuration Manager.
Version intelligence
A live answer to "is this actually the latest?" for every product. Semantic version comparison stops false "update available" noise, and you control the source for any app - point a monitor at a vendor page and pick the version with a click. No more guessing what's current.
Workplace automation & governance
Approve, reject or hold every product with a full decision trail - then let the agent do the legwork. Scheduled maintenance jobs keep devices clean and efficient (disk cleanup, update repair, housekeeping), while hardware-health monitoring catches failing disks, low space and battery wear and rolls out the fix automatically. One auditable console instead of four.
CE+ pre-assessment
Measure a client against the five Cyber Essentials Plus controls before the assessor does. Automated checks and agent probes score every device, show exactly what fails, and build the action plan and evidence trail to a pass.
Microsoft 365 licence optimisation
Cloud-side SAM through Microsoft Graph - who's using what, on desktop, mobile or web. Finds inactive licences, duplicate and unused seats, and desktop plans used only on the web, every finding costed in pounds. Reuses your Intune connection, read-only.
Endpoint protection health
Defender and anti-malware health from the agents - protection state, real-time scanning, signature age, tamper protection and risky exclusions, scored per device. Connect Defender for Endpoint for alerts, incidents and exposure.
What good looks like with APaaS Assure
Outcomes we underwrite in the contract - backed by continuous data refresh, the rationalisation engine and automated packaging.
14 daysCE+ patch window tracked live against every KEV exposure
4 hrsRefresh cadence for CISA KEV & NIST NVD overlay
MinutesTo package an app to your standards - vs. the ~2 weeks an outsourced house quotes
100+New CVEs published every day - all correlated to your estate, not a generic feed
28%Typical software estate retired in year one
99.95%Platform uptime SLA, UK-region hosted
100%Audit-trail coverage on every 5Rs and governance decision
Customer-specific outcomes vary by estate size, sector and existing tooling. We agree measurable targets up front during Pilot - what we don't hit, we don't bill for. Industry packaging cost based on outsourced day-rate quotes; CVE volume per NIST NVD (over 40,000 published in 2024).
CUSTOMER STORY
"We retired 137 apps with zero user complaints and shaved 31% off our software spend in the first quarter - and the repackaging that used to go out to a third party now happens in-house in an afternoon."
IT Director · UK water utility · 8,500 devices
Apps retired137
Spend saved31%
Time to first audit14 days
KEV exposures closed412
From exposure to packaged fix
Detection is table stakes. The platform takes you all the way to a deployable package.
1
Connect
Connect your ITAM / Intune / our agent in 60 minutes. We auto-discover every device and application.
2
Correlate
Your estate is matched against NIST NVD and CISA KEV every 4 hours, with the true latest version for each product.
3
Prioritise
The 5Rs engine ranks every product by usage and exposure. KEV-listed risks jump the SLA queue.
4
Package
Automate the fix: the platform fetches the latest release and wraps it in PSADT v3 to your client standards, documented.
5
Deploy & evidence
Deploy packages straight to Microsoft Intune and Configuration Manager, and export board- and auditor-ready CE+ evidence - the whole chain auditable end to end.
Replaces the stack - and the packaging house
Customers with 8,500 devices typically displace a four-tool stack costing £150k+ a year. The tools in that stack find the problem; none of them package the fix.
The stitched stack
Compliance automation (Drata, Vanta) · £40k
Vulnerability mgmt (Tenable, Qualys) · £55k
SAM & rationalisation (Flexera) · £120k
Patch & RMM (NinjaOne) · £141k
Outsourced packaging · £5k+ per app
Total: ~£356k / year + per-app fees
Five bills · four UIs · detection only
APaaS Assure
Continuous CE+ compliance & audit evidence
KEV-aware risk register with SLA clock
5Rs rationalisation on the whole estate
Unified ITAM · MDM · agent inventory
Automated packaging to your standards
From £80k / year
One platform · one dashboard · finds and fixes · UK support